[{"id":2232,"title":"由于第三方原因使监理工作受阻或延误,以致增加了工作量或延续时间是( )监理工作。","stem":"","options":"正常^*@*^附加^*@*^额外^*@*^临时","answer":"B","explanation":""},{"id":2754,"title":"FIDIC《施工合同条件》规定,选择指定分包商的基本原则是( )。","stem":"","options":"由承包商负责协调管理^*@*^业主必须保护承包商合法利益不受侵害^*@*^指定分包商的违约责任由承包商承担^*@*^承包商应向指定分包商收取协调管理费","answer":"B","explanation":""},{"id":2235,"title":"招标人与中标人签订施工合同时,以( )为准。","stem":"","options":"评标价^*@*^投标价^*@*^平均报价^*@*^协议价","answer":"B","explanation":""},{"id":2721,"title":"FIDIC《施工合同条件》规定,缺陷责任期是自( )开始,至工程师颁发履约证书为止的日历天数。","stem":"","options":"合同签字日^*@*^承包商正式开工日^*@*^工程接收证书中写明的竣工日^*@*^工程正式接收之日","answer":"C","explanation":""},{"id":2724,"title":"FIDIC《施工合同条件》规定,颁发履约证书是表示( )。","stem":"","options":"承包商的施工义务终止^*@*^合同终止^*@*^结清单生效^*@*^合同约定的权利义务已完全结束","answer":"A","explanation":""},{"id":2728,"title":"依据施工合同示范文本规定,工程竣工验收报告经发包人认可后( )d,承包人向发包人递交竣工结算报告及完整的结算资料。","stem":"","options":"7^*@*^14^*@*^28^*@*^56","answer":"C","explanation":""},{"id":1519,"title":"关于要约撤回的表述,不正确的是( )。","stem":"","options":"是指要约在发生法律效力之前,欲使其不发生法律效力而取消要约的意思表示^*@*^撤回要约的通知应当在要约到达受要约人之前到达受要约人^*@*^撤回要约的通知应当在要约到达受要约人同时到达受要约人^*@*^撤回要约的通知应当在受要约人发出承诺通知之前到达受要约人","answer":"D","explanation":""},{"id":1624,"title":"提供格式条款的一方应当遵循( )确定当事人之间的权利义务关系,并采取合理的方式提请对方注意免除或限制其责任的条款,按照对方的要求,对该条款予以说明。","stem":"","options":"公平的原则^*@*^诚实信用的原则^*@*^公开的原则^*@*^公正的原则","answer":"D","explanation":""},{"id":1680,"title":"法律规定应当采用书面形式的合同,当事人未采用书面形式,但已履行了全部或者主要义务的,可视为( )。","stem":"","options":"合同有效^*@*^合同无效^*@*^合同效力待定^*@*^可变更合同","answer":"A","explanation":""},{"id":1368,"title":"担保方式中的保证要求( )订立书面保证合同。","stem":"","options":"债权人和债务人^*@*^保证人和债权人^*@*^保证人和债务人^*@*^主合同当事人","answer":"B","explanation":""},{"id":2432,"title":"通用条款规定,( )指在协议书中约定,被发包人接受具有工程施工承包主体资格的当事人以及取得该当事人资格的合法继承人。","stem":"","options":"发包人^*@*^承包人^*@*^工程师^*@*^分包人","answer":"B","explanation":""},{"id":2461,"title":"施工合同示范文本规定,发包人不按约定支付预付款超过一定时间应向承包人支付应付款的贷款利息,其支付应付款的贷款利息是从( )起。","stem":"","options":"开工日期前7d^*@*^承包人发出预付通知之日^*@*^开工之日^*@*^约定应付预付款之日","answer":"D","explanation":""},{"id":2798,"title":"承包商在( )中按招标文件提供的信息和要求确认了每次扣留保留金的百分比和保留金限额。","stem":"","options":"投标书^*@*^评标报告^*@*^投标书附录^*@*^项目建议书","answer":"C","explanation":""},{"id":1873,"title":"建设工程施工合同中,在合同生效后,由于合同的价款不明,则按( )的市场价格履行。","stem":"","options":"工程所在地^*@*^施工单位所在地^*@*^建设单位所在地^*@*^签订合同所在地","answer":"A","explanation":""},{"id":2376,"title":"当设计人完成设计工作30%时,发包人由于该工程停建要求解除合同,此时发包人应进一步支付设计人()。","stem":"某工程设计合同,双方约定设计费为10万元,定金为2万元。","options":"3万元^*@*^5万元^*@*^7万元^*@*^10万元","answer":"A","explanation":"在合同履行期间,发包人要求终止或解除合同,设计人未开始设计工作的,不退还发包人已付的定金;已开始设计工作的,发包人应根据设计人已进行的实际工作量,不足一半时,按该阶段设计费的一半支付;超过一半时,按该阶段设计费的全部支付。设计费10万元的一半是5万元,已支付定金2万元,可以抵作设计费,就是说还需支付3万元。"},{"id":2458,"title":"施工合同订立后,任何一方都不能将合同转让给第三者,这体现了建设工程施工合同的( )原则。","stem":"","options":"公平竞争^*@*^平等合作^*@*^诺守合同^*@*^诚实信用","answer":"D","explanation":""},{"id":1513,"title":"接受要约的受要约人做出承诺后,要约和承诺的内容对( )产生法律约束力。","stem":"","options":"要约人^*@*^受要约人^*@*^双方^*@*^双方都不","answer":"C","explanation":""},{"id":2331,"title":"委托监理合同中,如果委托人认为监理人无正当理由而未履行监理义务时,采取的正确措施是( )。","stem":"","options":"可向监理人发出指明其未履行义务的通知,合同即行终止^*@*^可向监理人发出指明其未履行义务的通知。若委托人在21 d内没收到答复,合同即行终止^*@*^可向监理人发出指明其未履行义务的通知。若委托人在21 d内没收到答复,可在第1个通知发出后35 d内发出终止监理合同的通知,合同即行终止^*@*^可向监理人发出指明其未履行义务的通知。若委托人在21 d内没收到答复,可在第2个通知发出后35 d内发出终止监理合同的通知,合同即行终止","answer":"C","explanation":""},{"id":2153,"title":"某招标项目采用评标价法进行评标,有四家单位投标有效,其中( )的投标书为最优投标书。","stem":"","options":"投标报价980万元,评标价970万元^*@*^投标报价950万元,评标价960万元^*@*^投标报价1000万元,评标价950万元^*@*^投标报价1050万元,评标价940万元","answer":"D","explanation":""},{"id":1231,"title":"法律关系主体,主要是指参加管理、监督活动。受建设工程法律规范调整,在法律上享有权利、承担义务的( )。","stem":"","options":"自然人及其法人^*@*^自然人、法人和其他组织^*@*^自然人和其他组织^*@*^法人和其他组织","answer":"B","explanation":""},{"id":1957,"title":"代位权的行使范围以( )为限。","stem":"","options":"合同约定^*@*^债务人的债权^*@*^债务人的专属债权^*@*^债权人的债权","answer":"D","explanation":""},{"id":1230,"title":"法律意义上的行为是指人的有意识的活动。在合同法律关系中,行为多表现为完成一定的工作,下列属于行为的是( )。","stem":"","options":"建筑材料^*@*^建筑物^*@*^施工安装^*@*^计算机软件","answer":"A","explanation":""},{"id":1621,"title":"对格式条款的理解发生争议的,对格式条款有两种以上理解时,应当作出( )的解释。","stem":"","options":"有利于提供格式条款的一方^*@*^不利于提供格式条款的一方^*@*^宣布该条款无效^*@*^仲裁裁决","answer":"B","explanation":""},{"id":1367,"title":"不能作为保证人的团体是( )。","stem":"","options":"私营公司^*@*^国有公司^*@*^法人^*@*^学校","answer":"D","explanation":""},{"id":2157,"title":"投标文件中的大写金额和小写金额不一致时属细微偏差,修正此错误的原则是( )。","stem":"","options":"以大写金额为准^*@*^以金额高者为准^*@*^以小写金额为准^*@*^以金额低者为准","answer":"A","explanation":""},{"id":2389,"title":"经过修改的设计文件应( )使用。","stem":"","options":"报总监理工程师审核批准后^*@*^按设计管理程序经有关部门审批后^*@*^由设计人签字盖章后^*@*^由发包人审查批准后","answer":"B","explanation":"本题考查的是委托任务范围内的设计变更。经过修改的设计文件仍需按设计管理程序经有关部门审批后使用。故,本题选B"},{"id":1982,"title":"人民法院对专门性问题认为需要鉴定的,应当交由( )鉴定部门鉴定。","stem":"","options":"法定^*@*^当地政府指定的^*@*^当事人约定的^*@*^仲裁庭指定的","answer":"A","explanation":""},{"id":2697,"title":"建设工程施工过程中,有关工程量计量的表述,有误的是( )。","stem":"","options":"承包人为计量提供便利条件并派人参加^*@*^如果承包人收到通知后不参加计量,工程师自行计量的结果有效,作为工程价款支付的依据^*@*^若工程师不按约定时间通知承包人,致使承包人未能参加计量,工程师单方计量的结果无效^*@*^工程师接到承包人的报告后7d内,按设计图纸核实已完工程量,并在现场实际计量前48 h通知承包人共同参加","answer":"D","explanation":""}]
单选题
1
/
0
题干
0
1
、
标题
A
内容
【
正确答案
】
正确答案
【
答案解析
】
答案解析
上一题
免费刷题
解析
下一题