\n\t防洪限制水位(汛前限制水位)。水库在汛期允许兴利的上限水位,也是水库汛期防洪运用时的起调水位。\n<\/p>"},{"id":8388,"title":"整个坝段不设纵缝,以一个坝段进行浇筑的是( )。","stem":"","options":"通仓浇筑^*@*^平浇法^*@*^薄层浇筑^*@*^阶梯浇筑","answer":"A","explanation":""},{"id":10167,"title":"对于设计单位不同意采纳的设计变更建议,( )有权作出一般设计变更的决策。","stem":"","options":"监理单位^*@*^项目法人^*@*^设计审批部门^*@*^施工单位","answer":"B","explanation":"对于设计单位不同意采纳的设计变更建议,项目法人有权作出一般设计变更的决策,并对决策方案的正确性负责,设计单位受项目法人委托进行变更设计时对自己所作的设计成果负责。"},{"id":11031,"title":"工程变更支付的方式为( )。","stem":"","options":"随计日工支付^*@*^预付款支付^*@*^随工程价款支付^*@*^最终决算支付","answer":"C","explanation":"工程变更支付的方式为随工程价款的支付进行。"},{"id":8934,"title":"一人连续单个点火的火炮,明挖不得超过( )个。","stem":"","options":"5^*@*^10^*@*^15^*@*^20","answer":"B","explanation":""},{"id":8812,"title":"某水轮机型号为HL220-LJ-200,其中200表示( )。","stem":"","options":"转轮标称^*@*^直径转轮型号^*@*^主轴型号^*@*^工作水头","answer":"A","explanation":""},{"id":7767,"title":"在工程地质及水文地质勘察工作的几个阶段中,( )阶段的主要任务是在已选定的坝(闸)址区和库区等地,进一步查明与建筑物有关的工程地质条件。","stem":"","options":"规划选点^*@*^可行性研究^*@*^初步设计^*@*^技施设计","answer":"C","explanation":""},{"id":10159,"title":"中间产品指工程施工中使用的石料、混凝土拌合物等土建类工程的( )及半成品。","stem":"","options":"成品^*@*^原材料^*@*^预制品^*@*^出厂产品","answer":"A","explanation":""},{"id":10035,"title":"《关于建立水利建设工程安全生产条件市场准人制度的通知》自( )起实施。","stem":"","options":"2002年3月9日^*@*^2003年3月9日^*@*^2004年3月9日^*@*^2005年3月9日","answer":"D","explanation":""},{"id":8937,"title":"明挖爆破时,起爆信号是( )。","stem":"","options":"鸣30s、停、鸣30s、停、鸣30s^*@*^鸣20s、鸣10s、停、鸣20s、鸣10s、停、鸣20s、鸣10s^*@*^鸣10s、停、鸣10s、停、鸣10s^*@*^鸣20s、停、鸣20s、停、鸣20s","answer":"C","explanation":""},{"id":8337,"title":"一般钢木混合模板的周转率为( )次。","stem":"","options":"5~10^*@*^10~15^*@*^20~30^*@*^30~50","answer":"D","explanation":""},{"id":11006,"title":"水利工程施工中,后续单元工程凭( )方可开工。","stem":"","options":"分部工程开工申请获批^*@*^监理机构签发的上一单元工程施工质量合格证明^*@*^上一单元工程自检合格证明^*@*^质量监督部门签发的上一单元工程施工质量合格证明","answer":"B","explanation":""},{"id":8444,"title":"3.碾压混凝土坝的施工工艺程序一般为入仓、平仓、( )。","stem":"","options":"切缝、振动碾压、无振碾压^*@*^振动碾压、切缝、无振碾压^*@*^无振碾压、切缝、振动碾压^*@*^振动碾压、无振碾压、切缝","answer":"B","explanation":""},{"id":10193,"title":"下列关于《水利水电工程施工质量评定表》的填写错误的是( )。","stem":"","options":"应使用蓝或黑色墨水钢笔填写^*@*^数字应使用阿拉伯数字^*@*^合格率用百分数表示,小数点后保留两位^*@*^评定日期中的年填写四位数","answer":"C","explanation":""},{"id":8020,"title":"平行于水流方向的围堰为( )。","stem":"","options":"横向围堰^*@*^纵向围堰^*@*^过水围堰^*@*^不过水围堰","answer":"B","explanation":""},{"id":9669,"title":"工程项目竣工验收时,必须向验收委员会汇报并提交历次质量缺陷的备案资料的单位是( )。","stem":"","options":"施工单位^*@*^监理单位^*@*^设计单位^*@*^项目法人","answer":"D","explanation":""},{"id":10775,"title":"某水利建筑工程的机电设备安装工程的单价计算中,直接工程费为Ⅰ,直接费为Ⅱ,人工费为Ⅲ,其他直接费为Ⅳ,现场经费为Ⅴ,已知间接费的费率为η,则间接费为( )。","stem":"","options":"Ⅰ×η^*@*^Ⅱ×η^*@*^Ⅲ×η^*@*^(Ⅰ+Ⅳ+Ⅴ)×η","answer":"C","explanation":""},{"id":8986,"title":"水利工程建设监理对工程建设的投资、工期和质量实施管理的工作方式为( )。","stem":"","options":"合同管理^*@*^质量管理^*@*^进度管理^*@*^全面管理","answer":"A","explanation":"水利工程建设监理对工程建设的投资、工期和质量实施管理的工作方式为合同管理。"},{"id":8602,"title":"疏浚工程中浅埂长度为( )时,应进行返工处理。","stem":"","options":"≥1m^*@*^≥1.5m^*@*^≥2m^*@*^≥2.5m","answer":"D","explanation":"
\n\t疏浚工程原则上不允许欠挖,局部欠挖如超出下列规定时,应进行返工处理:\n<\/p>\n
\n\t(1)欠挖厚度小于设计水深的5%,且不大于30cm; \n(2)横向浅埂长度小于设计底宽的5%,且不大于2m; \n(3)浅埂长度小于2. 5m。\n<\/p>"},{"id":10365,"title":"关于工程验收和投入使用,以下说法正确的是( )。","stem":"","options":"验收不合格的工程不得交付使用,但经项目法人同意后可进行后续工程施工^*@*^未经验收的工程一般不得交付使用,但对特殊情况的工程经主管部门同意后,可提前投入使用,然后再组织验收^*@*^未经验收或验收不合格的工程不得交付使用或进行后续工程施工^*@*^未经验收的工程不得交付使用,但经监理单位同意后可进行后续工程施工","answer":"C","explanation":""}]
【正确答案】 正确答案
上一题
免费刷题
解析
下一题