[{"id":2724,"title":"FIDIC《施工合同条件》规定,颁发履约证书是表示( )。","stem":"","options":"承包商的施工义务终止^*@*^合同终止^*@*^结清单生效^*@*^合同约定的权利义务已完全结束","answer":"A","explanation":""},{"id":1628,"title":"下列选项中,( )的内容符合要约规定的,视为要约。","stem":"","options":"价目表的寄送^*@*^招标公告^*@*^商业广告^*@*^招股说明书","answer":"C","explanation":""},{"id":2045,"title":"某工程项目的招标资格审查文件中明确规定外地施工单位不允许参与投标,这是建设行政主管部门核查投标人资格审查文件的( )内容。","stem":"","options":"不得以不合理条件限制或排斥潜在投标人^*@*^不得使招标时间长、费用高^*@*^不得对潜在投标人实行歧视待遇^*@*^不得强制投标人组成联合体投标","answer":"A","explanation":""},{"id":2758,"title":"工程师对承包商采购的材料和施工的工程通过检验后发现质量未达到合同规定的标准,承包商应自费改正并在相同条件下进行重复试验,重复检验所发生的额外费用由( )承担。","stem":"","options":"承包商^*@*^工程师^*@*^业主^*@*^承包商和业主共同","answer":"A","explanation":""},{"id":2754,"title":"FIDIC《施工合同条件》规定,选择指定分包商的基本原则是( )。","stem":"","options":"由承包商负责协调管理^*@*^业主必须保护承包商合法利益不受侵害^*@*^指定分包商的违约责任由承包商承担^*@*^承包商应向指定分包商收取协调管理费","answer":"B","explanation":""},{"id":2492,"title":"材料采购合同当事人任何一方不能正确履行合同义务时,均应以( )的形式承担违约赔偿责任。","stem":"","options":"违约金^*@*^继续履行^*@*^赔偿损失^*@*^赔偿价差损失","answer":"A","explanation":""},{"id":2750,"title":"FIDIC施工合同通用条件规定,如果由工程师批准的承包商的变更建议包括一项对部分永久工程的设计的改变,双方没有其他协议,( )应设计该部分工程。","stem":"","options":"业主^*@*^原设计人^*@*^工程师^*@*^承包商","answer":"D","explanation":""},{"id":2178,"title":"评标委员会由招标人的代表和有关技术、经济等方面的专家组成,其中招标人以外的专家不得少于成员总数的( )。","stem":"","options":"1\/3^*@*^1\/2^*@*^2\/3^*@*^3\/4","answer":"C","explanation":""},{"id":2336,"title":"监理合同的酬金中,监理人在监理过程中提出的合理化建议使委托人得到了经济效益,而获得的经济奖励属于( )。","stem":"","options":"正常监理工作的酬金^*@*^附加监理工作的酬金^*@*^额外监理工作的酬金^*@*^奖金","answer":"D","explanation":""},{"id":2316,"title":"委托人要授权一位熟悉建设工程情况,能迅速做出决定的常驻代表,负责与监理人联系,更换此人要( )。","stem":"","options":"提前通知承包人^*@*^提前通知监理人^*@*^经承包人同意^*@*^经监理人同意","answer":"B","explanation":""},{"id":1870,"title":"合同的履行以( )为前提和依据。","stem":"","options":"有效的合同^*@*^合同标的^*@*^法律、法规^*@*^合同当事人","answer":"A","explanation":""},{"id":2638,"title":"施工中发包人需要变更的工程超过原设计标准或批准建设规模时,发包人应报送有关部门重新审批,并由( )提供变更的相应图纸和说明。","stem":"","options":"承包人^*@*^监理单位^*@*^原设计单位^*@*^规划管理部门","answer":"C","explanation":""},{"id":1956,"title":"撤销权的行使范围以债权人的债权为限,其发生的费用由债务人承担。撤销权自债权人知道或者应当知道撤销事由之日起( )内行使。","stem":"","options":"1年^*@*^2年^*@*^3年^*@*^5年","answer":"A","explanation":""},{"id":1784,"title":"表见代理一般应当具备的条件不包括( )。","stem":"","options":"客观上存在让相对人相信行为人具备代理权的理由^*@*^相对人善意且无过失^*@*^表见代理人并未获得被代理人的书面明确授权,是无权代理^*@*^相对人善意且有过失","answer":"D","explanation":""},{"id":2484,"title":"发包人供应的材料未通知承包人验收,入库后发生的损坏丢失由( )。","stem":"","options":"承包人负责^*@*^发包人负责^*@*^谁承担视具体情况决定^*@*^承包人和发包人共同负责","answer":"B","explanation":""},{"id":1874,"title":"建设工程施工合同履行中,如果履行地点不明确的,给付货币的,在( )履行。","stem":"","options":"共同协商的地方^*@*^送达货币一方所在地^*@*^接收货币一方所在地^*@*^法律、法规规定的地方","answer":"C","explanation":""},{"id":1969,"title":"合同一方当事人通过资产重组分为两个独立的法人,原法人签订的合同( )。","stem":"","options":"仍然有效^*@*^效力待定^*@*^归于无效^*@*^可以撤销","answer":"A","explanation":""},{"id":2407,"title":"发包人逾期支付设计费( )d以上时,设计人有权暂停履行下阶段工作,并书面通知发包人。","stem":"","options":"14^*@*^15^*@*^28^*@*^30","answer":"D","explanation":"本题考查的是设计合同履行管理。发包人应按合同规定的金额和时间向设计人支付设计费,每逾期支付1天,应承担支付金额千分之二的逾期违约金,且设计人提交设计文件的时间顺延。逾期超过30天以上时,设计人有权暂停履行下一阶段工作,并书面通知发包人。故,本题选D"},{"id":2467,"title":"按照通用条款的规定,当合同文件内容含糊不清或不一致时,在不影响工程正常进行的情况下,由( )解决。","stem":"","options":"工程师^*@*^承包人^*@*^发包人^*@*^发包人和承包人协商","answer":"D","explanation":""},{"id":1322,"title":"委托代理人与第三人签订合同的法律特征表现为( )。","stem":"","options":"以代理人的名义与对方谈判^*@*^商签的合同内应有代理人权利和义务的条款^*@*^代理人在合同谈判过程中自主地提出自己的要求^*@*^所形成的合同由委托人和代理人共同履行","answer":"C","explanation":""},{"id":1998,"title":"当事人申请撤销裁决的,应当自收到裁决书之日起( )个月内提出。","stem":"","options":"1^*@*^2^*@*^6^*@*^12","answer":"C","explanation":""},{"id":1788,"title":"合同成立后,合同中的( )条款是独立存在。","stem":"","options":"解决争端^*@*^违约责任^*@*^履行期限^*@*^仲裁","answer":"D","explanation":""},{"id":1996,"title":"依据《合同法》的规定,执行政府定价的合同,合同当事人一方逾期交付标的物时,遇价格上涨,按( )执行。","stem":"","options":"原价格^*@*^新价格^*@*^当地市场价格^*@*^签订合同地市场价格","answer":"A","explanation":""},{"id":1990,"title":"当事人互负债务,没有先后履行顺序的一方在对方履行之前有权拒绝其履行要求,这属于合同履行中的( )。","stem":"","options":"不安抗辩权^*@*^撤销权^*@*^代位权^*@*^同时履行抗辩权","answer":"D","explanation":""},{"id":2317,"title":"在监理合同履行中,委托人提供一部手机供监理人使用。监理工作完成后,该部手机应( )。","stem":"","options":"无偿归监理人所有^*@*^归还委托人,监理人支付折旧等费用^*@*^按原值付款后归监理人^*@*^归还委托人,监理人无须支付费用","answer":"D","explanation":""},{"id":2611,"title":"按照施工合同范本通用条件的规定,( )原因造成的工期延误,经工程师确认后工期不予顺延。","stem":"","options":"不可抗力^*@*^设计变更和工程量增加^*@*^发包人不能按专用条款的约定提供开工条件^*@*^一周内非承包人原因停水、停电、停气造成停工累计6h","answer":"D","explanation":""},{"id":1953,"title":"合同变更的必要条件是( )。","stem":"","options":"消灭合同债^*@*^变更合同内容^*@*^协商一致^*@*^互惠互利","answer":"C","explanation":""},{"id":2331,"title":"委托监理合同中,如果委托人认为监理人无正当理由而未履行监理义务时,采取的正确措施是( )。","stem":"","options":"可向监理人发出指明其未履行义务的通知,合同即行终止^*@*^可向监理人发出指明其未履行义务的通知。若委托人在21 d内没收到答复,合同即行终止^*@*^可向监理人发出指明其未履行义务的通知。若委托人在21 d内没收到答复,可在第1个通知发出后35 d内发出终止监理合同的通知,合同即行终止^*@*^可向监理人发出指明其未履行义务的通知。若委托人在21 d内没收到答复,可在第2个通知发出后35 d内发出终止监理合同的通知,合同即行终止","answer":"C","explanation":""},{"id":2408,"title":"设计合同生效后,设计人要求终止或解除合同,设计人应( )。","stem":"","options":"退还定金^*@*^退还定金并赔偿发包人损失^*@*^双倍返还定金^*@*^支付设计费的2‰的违约金","answer":"C","explanation":"本题考查的是设计合同履行管理。设计人原因要求解除合同合同生效后,设计人要求终止或解除合同,设计人应双倍返还定金。故,本题选C"},{"id":2455,"title":"施工过程中,如果发包人需要撤换工程师,应至少于易人前()d以书面形式通知承包人,并在继续履行前任作出的书面承诺。","stem":"","options":"7^*@*^14^*@*^28^*@*^30","answer":"A","explanation":""},{"id":1622,"title":"在格式条款与非格式条款不一致时,应当采用( )。","stem":"","options":"格式条款^*@*^非格式条款^*@*^协商解决^*@*^合同争议的解决方法","answer":"B","explanation":""},{"id":2799,"title":"FIDIC施工合同中,业主每月支付承包商进度款时,以( )作为支付依据。","stem":"","options":"实际完成的工程量^*@*^工程量清单中的工程量^*@*^工程师的签证^*@*^承包商的支付报告","answer":"A","explanation":""},{"id":1879,"title":"承担缔约过失责任的情形不包括( )。","stem":"","options":"假借订立合同,恶意进行磋商^*@*^违反缔约中的保密义务^*@*^缔约当事人的过错行为与该损失之间有因果关系^*@*^故意隐瞒与订立合同有关的重要事实或提供虚假情况","answer":"C","explanation":""},{"id":1412,"title":"质押中的质权是一种约定的担保物权,以( )为特征。","stem":"","options":"约定保证期间^*@*^债权人优先受偿^*@*^转移占有^*@*^转让需办理登记","answer":"C","explanation":""}]
单选题
1
/
0
题干
0
1
、
标题
A
内容
【
正确答案
】
正确答案
【
答案解析
】
答案解析
上一题
免费刷题
解析
下一题